Showing posts with label bath. Show all posts
Showing posts with label bath. Show all posts

Sunday, November 15, 2009

Behind the Red Doors

There used to be a song - "Behind the Green Door", but in our house it is "Behind the Red Door". We decided to liven up the bedroom and bathrooms by painting the doors a shade of red. I like it, especially with the wood walls. Here are a couple of pictures which show how much difference the background can make. (ignore the odd door stop in the bedroom, ha)


Now, Dave is just finishing up the final woodwork and we are having a built-in utility sink made for the odd corner in the back hallway. It should be done by the first week in December. If our couch and chair actually show-up in time, we will be "finished" for Christmas. What a present!Technorati Tags: , ,

Sunday, February 24, 2008

Several items - Shower Vanity and Living Room Ceiling


A quick catch up on interior work. We have finished all the tongue and groove! Wasn't sure that I would ever be able to type those words. We have tongue and groove on nearly all the wood framed walls and most of the ceilings now. Some still needs polyurethane - but it is up. Took a break from the tiling to install a vanity in the shower bathroom. Our cabinet maker, MidMaine Furniture (did such a fabulous job on the Hickory kitchen) is extremely busy and won't be able to get to our final work until summer. We can wait for the pantry, towel closet and dressing table - but really needed a sink in this bathroom. So, here it is - he is going to match it as well as possible. It is a good brand, but I can certainly see the difference in this and his products.

The last few days have seen Dave back outside - he discovered that he needed to take some of the winter build-up off the roof (I'll blog that separately). We have had some ice and that makes the driveway a skating rink - slid down it using the piles of snow as bumpers last week. So, he is working to try to get some traction somehow - next year we are going to get a pile of sand to use when this happens. Having sun today and yesterday - brought the house temp up to around 80 and helped a little.

The study floor is filling in - having a non-square room is not conducive to quick tiling. The den is where the jog in the floorplan appears - lots of triangles....
We now have the fan and wall lights ready to mount in there - that may be the first completely finished room! It will be good to get my corner cabinet and the computer back into that room and out of the garage and dining areas.

Looking at a Vermont company, Hubbardton Forge, for the lights in the dining and living room - Love their products and like the idea of purchasing from a US company (especially one in the NE).




Saturday, May 12, 2007

Not quite purple

It's Spring - that means a lot more time outside and not so much to report for the "construction". Dave has been working on the bathrooms - we also have the shower now finished (hired it completed). The shower is a walk-in and sits on the north side of the house. That means there are no windows - day light is courtesy of a solatube though. We worry about any moisture in this part of the house. So, we had a complete system installed using a waterproofing called Schluter-Ditra (a polyethylene membrane with a grid structure of square, cut-back cavities and an anchoring fleece laminated to its underside. In conjunction with tiled coverings, Schlüter®-DITRA forms an uncoupling, waterproofing, and vapor pressure equalization layer.). First this covering is applied (like wallpaper - you can see the finished product on the left), then the tile is laid using a special bonding agent. It looks quite nice and we are certainly enjoying being able to take showers again. There are some pictures posted in the Gallery of the process.

The tub bathroom is now painted - Mozart, a very light lavender from True Value. We have some trim to install there around the tub, sink and baseboard. Dave does a much better job with the paint brush than I do.




Turbo Tagger