Sunday, September 13, 2009

Blended stone


Our front door has needed an entry for a long time. Not for guests (usually come through the garage or the study door), but for the dogs to rest, ha.

We decided that it was too difficult to make an even area with all natural stone. So, purchased some concrete patio stones in a natural color. Dave used a bed of sand - can't do much in that area since it is over the styrofoam around the foundation - but that same styrofoam keeps it from freezing and heaving in the winter anyway.

We did use natural stone to finish it off and hope to continue some work in this front with raised beds - maybe next Spring.
There are pictures in our Gallery - check here.


September already?

I just took a quick look at the blog and discovered that it has been two months since our last post. We have been busy with the garden and outside chores, but are now slowing down as Fall approaches. It was a bad year for gardening - very very wet early and cool most of the months. The corn is small and just today we discovered the borers are starting to take their share. The tomatoes managed to contract the blight that has been infesting potato fields in northern Maine as well as tomatoes around us. They rot as they ripen and there will be no juice or sauce made from this poor crop. Dave planted pumpkins and they seem to be doing well - now, what to do with them to save for the winter?

Inside we did make continued progress with only some baseboard and trim to finish before saying, "Done!" The bathroom towel cabinet and end of hall bookcases are nearing completion. That will leave the table in the study and a utility sink at the back entrance. Who would have thought it would take this long to really finish this place?

We are thinking about ways to use renewables to supplement our hot water. Propane is our one fossil fuel use and it would be great to see it at least dwindle. Stay tuned.

I think I have some pictures on the camera and will see if anything is worth posting - hopefully, I can get back to this more regularly.
Technorati Tags: , ,

Sunday, July 12, 2009

Pantry - day 2


Larry, the cabinet guru, arrived around 8 am and set to work on the pantry. It isn't easy to get everything level and mounted in a concrete house. But, he did a marvelous job. From the first placement of an upper cabinet for measurement through mounting the doors and finally the hardware, it all went smoothly.

The glass inserts in the top doors came out even better than we anticipated. You can see what is behind them, but it is not as obvious as clear panes would be - just subtle hints of the goodies that lie behind.

We used the same hardware as is in the kitchen which, along with the hickory, ties the two together nicely.

The two end cabinets (wine rack, waste-can and dogfood bin) will have slate tops to match the counter in the kitchen. Those will need to be ordered now that we can make the templates.

Day 3 - finish the regular kitchen (faux top covering the rangehood pipe and trim around the hanging wall). I'll post final pictures then.



Saturday, July 11, 2009

from blank to pantry

Although we have been happily (and environmentally consciously) living in our bermed house for a couple of years, there are a couple of things that have been on hold. The largest of these finalizing projects was our back hallway pantry.

We designed the cabinets and went back to Mid-Maine Furniture to build and install them. They will match the hickory in the kitchen and include some etched glass in the upper units. Hopefully, the glass will keep it from looking to massive and dark. Today, the transformation program began. Out went the open plastic shelves to open up the area .


Since the concrete floor and walls are not exact, it took most of the day to level and place the plinth.


Then we set the bottom units on for the night.

Stay tuned - tomorrow we continue.